PP Yangzi Petrochemical F301 Resin

PP Yangzi Petrochemical F301 Resin

Material Introduction: PP Yangzi Petrochemical F301 is spinning‑grade homopolymer polypropylene. It features good mechanical properties, heat resistance and chemical stability for multiple‑field applications.

Main Applications

Woven products: woven bags for grain, fertilizer and cement packaging, packing straps, ropes, brushes, net‑type products, carpet base fabrics.

Injection‑molded products: automotive interior parts (seat frames, interior panels), home‑appliance housings (computer cases, TV housings), household articles (plastic chairs, tables, storage boxes) and daily‑use goods.

Performance Parameters

Performance Category Test Item Test Condition Value / Range Unit Reference Standard Remarks & Interpretation
Basic Properties Melt Flow Rate(MFR) 230℃/2.16kg 1.1‑1.9 g/10 min ASTM D1238 Low‑flow spinning‑grade homopolymer PP.
  Density 0.90‑0.91 g/cm³ ASTM D792, ASTM D1505
Mechanical Properties Tensile Yield Strength ≥30.0 MPa ASTM D638
  Flexural Modulus To be confirmed MPa ASTM D790 Pending data.
  Elongation at Break To be confirmed % ASTM D638 Pending data.
  Izod Impact Strength 23℃ To be confirmed J/m ASTM D256 Pending data.
  Rockwell Hardness R‑scale To be confirmed ASTM D785 Pending data.
Thermal Properties Heat‑Distortion Temperature(HDT) 0.45 MPa / 0.46 MPa, non‑annealed To be confirmed ASTM D648 Pending data.
Other Properties Isotactic Index ≥96.0 %
  Cleanness ≤10 pcs/kg Impurity particle control.
  Powder Ash Content ≤0.03 %

Injection‑Molding Process Parameters

Process Item Suggested Range / Description Remarks
Drying treatment Generally unnecessary; dry at 80℃ for 1‑2 h under poor storage condition PP low‑moisture‑absorption feature.
Barrel rear zone(feed section) 160‑200℃ Prevent thermal degradation.
Barrel middle zone(compression section) 180‑220℃
Barrel front zone(metering section) 200‑240℃
Nozzle temperature 200‑240℃
Melt temperature 220‑280℃
Mold temperature 30‑70℃,recommended 40‑60℃ Crystallization mainly determined by mold temperature. Low temperature: poor surface, weld‑line and flow‑mark risks; high temperature will cause warpage.
Injection pressure 80‑140 MPa(800‑1400 bar) Higher pressure available for thin‑wall or complex‑structure parts.
Holding pressure 30%‑60% of injection pressure Prevent sink mark and excessive shrinkage; holding time accounts for approx. 30% of cycle time.
Back pressure 5‑20 MPa(50‑200 bar)
Injection speed Medium injection speed; high‑speed injection required for thin‑wall packaging containers.
Screw speed High screw speed(linear velocity 1.3 m/s) is permitted Complete plasticization before cooling phase finishes.
Runner & Gate Pin‑point gate or multi‑point gate; heated hot‑runner, insulated hot‑runner. Gate shall be set at thick‑wall position of product, otherwise severe shrinkage defect easily occurs. Mold‑design suggestion.

Disclaimer: All above data is for reference only.

  • toolbar
  • toolbar
  • toolbar
  • toolbar